Interior

MLC 2006 and STCW 2010 Compliance — Built In, Not Bolted On

Four tabs: My Records for each crew member, Team for the department view, Templates for repeating watch patterns, and Watch Schedule. Every entry is checked against MLC 2006 and STCW 2010 limits on the spot. Weekly analysis surfaces patterns before they become violations. Exemptions are handled in their own panel — documented, not improvised. PDF reports per crew member, ready for PSC.

The Problem

Hours of rest are filled in on paper forms at the end of the month. Nobody catches violations until a port state inspector asks. Rest patterns that don't comply with MLC minimums go unnoticed until someone is exhausted.

What you get

  • My Records, Team, Templates, and Watch Schedule tabs
  • Automatic MLC 2006 and STCW 2010 compliance checking
  • Weekly analysis of rest patterns
  • Exemption panel — documented deviations, not improvised ones
  • Templates for repeating watch patterns
  • PDF reports per crew member — port state inspection ready
  • 24-hour rest matrix visualization
  • Master and seafarer digital signatures

Works OfflineAll rest logging and compliance checking works at sea without internet.

Connected modules

FAQ

See Hours of Rest in the full operating system